# Turla Emulation Plans

An emulation plan is the primary document used to execute the red team scenario during a purple team operation. This document includes red team execution commands, links to source code, ATT&CK techniques leveraged, and CTI reporting references.

When we have multiple emulation plans, we break these plans into scenarios and provide a description of the plan's focus.

Emulation Plan CTI Operations Flow Description
Carbon Scenario Carbon Operations Flow This directory contains the scenarios developed focusing on Turla's usage of Carbon. This plan was used to conduct ATT&CK Evaluations Enterprise Round 5 in 2023
Snake Scenario Snake Operations Flow This directory contains the scenarios developed focusing on Turla's usage of Snake. This plan was used to conduct ATT&CK Evaluations Enterprise Round 5 in 2023.
Caldera Support Files This directory contains the setup instructions and data for porting the above scenarios into Caldera